GEC Power Engineering Limited. Research Laboratory. Residual Stress Measurements On A 65" Diameter Monobloc L.P. Turbine Rotor Forging PERSC Project MP/G.11. Research Laboratory Report TPL/R. 12,126. 1971.

Details

Extent:
1
Identifier:
YA2003.50/1/4/1242
Subject:
Engineering, Electrical Engineering, Research Work