Sample of submarine cable laid between Dover and Calais, 1850
Short length (including a joint) of the original Cross-Channel submarine telegraph cable laid on 28th August 1850 between Dover and Calais. Cable originally made by Gutta Percha Company, Islington, London, England, 1850.