Pair of leggings, with distinct virus and bacteria design motifs, as worn by Dr Elisa Granato on the 23 April 2020 when she was the very first volunteer vaccinated in the clinical trial of the COVID-19 vaccine developed by the University of Oxford and later in partnership with AstraZeneca. Leggings with virus and bacteria motif 2018-2020
High visibility foul weather jacket, orange with reflective banding, made by Cosalt Workwear Limited, Network Rail branded, worn on the railway trackside, conforms to BS EN 471:1994 Class 3. Network Rail High Vis jacket
Crew jacket worn by Paul Berry on the set of the 1996 Disney stop-motion animation film James and the Giant Peach 1996
Dr3 sensor belt for use with PillCam capsule endoscopy, Given Imaging, 2000-2010 Belt for use with PillCam capsule endoscopy 2000-2010
White polyester T-shirt, size large, printed with 'Powered by a heart transplant www.organdonation.nhs.uk' worn by a heart transplant receipent while running to publicise organ donation, T-shirt made by Alo, made in Guatemala, printed in United States, 2014 Printed T-shirt: 'Powered by a heart transplant www.organdonation.nhs.uk' 2014
Video footage taken on 6 May 1986 in National Railway Museum's yard, boiler lifted from frames, tape 2 of 2. Filmed by Gavin Mist, sound recorded by Kenneth Mellor. Low band, unedited original camera tape. Colour, sound. Duration: 20 minutes maximum U-matic S videotape ‘Duchess of Hamilton Locomotive Overhaul project’ tape 2 of 26 1986-05-06
Video footage taken on 6 and 7 March 1989, boiler arrives at National Railway Museum, tender tank fitted to frames, tape 7 of 8 (repair work in March 1989). Filmed by Gavin Mist, sound recorded by Kenneth Mellor. Low band, unedited original camera tape. Colour, sound. Duration: 20 minutes maximum U-matic S videotape ‘Duchess of Hamilton Locomotive Overhaul project’ tape 13 of 26 1989-03-06; 1989-07
Video footage taken on 29 November 1986 on Weymouth Harbour Tramway line (Quay Branch) in Dorset, special train filmed on the section from Weymouth Station to the Quay Terminal. 2 tapes. Low band, unedited original camera tapes. Colour, sound. Duration: 20 minutes maximum each U-matic S videotapes ‘Weymouth Quay Tramway' 1986-11-29
Video footage taken on 3 February 1990, in NRM workshop, tape 2 of 5 (linked to tapes 15, 17, 21 and 22 of 26). Also footage taken on 22 February 1990, in NRM workshop, tape 1 of 2 (paired with tape 18 of 26). Filmed by Gavin Mist, sound recorded by Kenneth Mellor. Low band, unedited original camera tape. Colour, sound. Duration: 20 minutes maximum U-matic S videotape ‘Duchess of Hamilton Locomotive Overhaul project’ tape 16 of 26 1990-02-03; 1990-02-22
Sound only on tape, colour bars on image. v/o dump J. Coiley/J. Gilks (unedited). Possibly used in the production of FNRM Archive Magazine U-matic S videotape 'FNRM Archive Magazine v/o Dump' 1980s
Video footage taken on 28 January 1988 at C. H. Thompson in Oldham, repair work on locomotive boiler and firebox, tape 1 of 3. Filmed by Gavin Mist, sound recorded by Kenneth Mellor. Low band, unedited original camera tape. Colour, sound. Duration: 20 minutes maximum U-matic S videotape ‘Duchess of Hamilton Locomotive Overhaul project’ tape 3 of 26 1988-01-28
Video footage taken on in July 1984 of Goole Swing Bridge, exteriors, bridge operating, signal cabin interior and details, with signalman George Lee, engine room interior and details. 4 tapes. Tape 1 of 4: long and close-ups of bridge, trains passing over bridge, engine room shots with operation, hydraulic cylinder operating; tape 2 of 4: cabin and span, bridge swinging, exterior shots sunny weather, points operating, signal operating, track details, cabin exterior; tape 3 of 4: ships passing bridge, trains on bridge, bridge gear opeating at join, bridge swinging and ship passing, from cabin; tape 4 of 4: inside cabin, operation of bridge and signals from cabin. Material edited into a 27 minutes video in 1986. Low band, unedited original camera tapes. Colour, sound. Duration: 20 minutes maximum each U-matic S videotapes ‘Goole Swing Bridge' 1984-07
Video footage taken on 26 and 27 March 1990, in steam in NRM workshop, tape 3 of 5 (linked to tape 15, 16, 21 and 22 of 26). Filmed by Gavin Mist, sound recorded by Kenneth Mellor. Low band, unedited original camera tape. Colour, sound. Duration: 20 minutes maximum U-matic S videotape ‘Duchess of Hamilton Locomotive Overhaul project’ tape 17 of 26 1990-03-26; 1990-03-27